
New 300mm UMC Fab to include 53,000 square meters of cleanrooms
Business news
|
By
eeNews Europe
The two-phase design, known as Fab12A Phase 5 & 6, involves approximately 380,000 square meters of microchip manufacturing and 80,000 square meters (seven floors) of office space. Total multi-level cleanroom area is 53,000 square meters, about the size of 10 American football fields. Process technology will be 28-nanometer initially with future 20/14-nanometer capability.
The project also includes two office buildings, training space, employee service buildings, two power substations, warehouses and a multi-level pedestrian bridge to connect the new building with existing facilities and provide a clean environment for product transport.
