TSMC breaks ground for Phase 3 of its Fab 15 GigaFab
At the same time, Fab 15, Phase 2 started construction in mid-2011 and is expected to begin volume production next year. Fab 15 Phases 1 and 2 are forecast to generate as much as US$3 billion in revenue per year once they enter volume production, and Phase 3 will also reach a similar scale in the future.
Fab 15 currently employs approximately 1,400 employees, and is expected to create a total of 8,000 high-quality job opportunities, developing talent for Taiwan’s semiconductor industry and bringing more high value-added growth opportunities to TSMC. The groundbreaking ceremony was led by TSMC Chairman Dr. Morris Chang.
Fab 15, Phase 3 will be TSMC’s second GigaFab equipped for 20nm process technology, and the company’s third “green fab” following Fab 12 and Fab 14. Fab 15, Phase 3 applies numerous pollution prevention and energy conservation methods, including classification of process wastewater into 25 categories, an effective process water recycling rate of 90%, water use reduction of 62%, and 5% less power consumption than earlier facilities. In addition, Fab 15, Phase 3 has a rainwater collection surface of 40,000 square meters, and all collected rainwater is used in landscaping, consuming no water from public utilities.
The company aims to create a benchmark in high-quality green buildings with treatment effectiveness of cleanroom exhaust reaching as high as 98%, innovations in recirculation of waste heat, as well as application solar power and LED lighting technology. The construction of Fab 15, Phase 3 will continue to push forward the development of green factories by creating a green environment with comprehensive functionality.
Visit TSMC at www.tsmc.com